An inspection revealed that Oak Street Bridge across the railroad spur is in poor condition. As a result, the bridge is closed to all vehicular traffic.
Street Maintenance Construction
We are currently performing gutter and sidewalk upgrades on Oakview Ave between Chester St and Buckner St.
Sidewalk upgrades are being performed on Oakview Ave between Harmeling St. and Clinton St..